TGS Co. Ltd.  has been subcontracted works on either a unit rate or an hourly rate at the Tigne Point  since late 2003. It has been involved on various contracts there , and in some instances because of the delicacy of the works undertaken, the main contractor chose to exclusively use TGS personnel including site supervisors and project managers.

This was the case for example during the construction of the Underground Relief Tunnel where it was required to preserve the gunposts (built by the British) underwhich part of the tunnel is constructed. In the case of the construction of Block T6 and T7 all civil works on these Blocks was assigned to TGS by the main contractor.
TGS was also involved in the construction of the Belvedere, and the construction of the new The Point Shopping Centre at sub structure/car park level also on the Tigne peninsula.